Schedule Audit

A schedule is an execution plan for carrying out a process or procedure, giving lists of intended events and times.

Recent Requests
Log in to see full request history
TimeStatusUser Agent
Retrieving recent requests…
LoadingLoading…
Body Params
string
required
string | null
string
required
int32
string | null
string | null

A description of the schedule including the frequency and days the schedule is intended to run.

int32 | null

The number of seconds between each execution of the process associated with the schedule.

string | null

The time after which the schedule should stop running.

string | null

The time at which the schedule should start

boolean | null

The Monday field in the Schedule table is a bit data type that stores a boolean value indicating whether or not the Schedule is valid for Monday. A '1' value indicates that the Schedule is valid for Monday, while a '0' value indicates that the Schedule is not valid for Monday.

boolean | null

Tuesday is a field of data type bit in the Schedule table that sets a flag indicating if the row describes a day that occurs on Tuesday. If the value of this field is set to 1, it means the row describes a Tuesday, otherwise a 0 indicates that Tuesday is not the day represented by the row.

boolean | null

The Wednesday field in the Schedule table is a bit data type and is used to track whether or not an event will occur on Wednesdays; it is a 0 or 1 where 1 indicates that an event will occur and 0 indicates that no event is scheduled.

boolean | null

Checked if the schedule should be executed on Thursdays

boolean | null

Friday is a bit field in the Schedule table that stores the value of 1 (true) when the Schedule is active on Fridays, and 0 (false) when the Schedule is not active on Fridays.

boolean | null

The Saturday field in the Schedule table is a bit datatype representing whether activities scheduled on Saturday should be included in the Schedule. The field can have the values 0 (false) or 1 (true).

boolean | null

The Sunday field in the Schedule table is a bit data type and it represents whether or not a schedule starts/ends on Sunday. A bit value of 1 means that the schedule extends to include Sunday, while a bit value of 0 means that the schedule does not include Sunday.

int32 | null
Headers
string
enum
Defaults to application/json;odata.metadata=minimal;odata.streaming=true

Generated from available request content types

Response
200

OK

Language
URL
LoadingLoading…
Response